All Services

Silo bridging – how to break it

The Problem

Material has formed a stable bridge over the discharge outlet. The weight of the material above supports the arch.

The Consequence

The silo is full but empty beneath the bridge. Risk of sudden collapse.

Traditional Methods

Manual poking from below – life-threatening. If the bridge collapses suddenly, tonnes of material fall.

The Blue Power Solution

BinDrill perforates the bridge in a controlled manner from above. Material is released gradually and safely.

Who Is This For?

Cement plants, power stations, grain terminals – anyone handling cohesive materials.

Get in Touch

Contact us for a non-binding assessment

Request Help